Friday, September 12, 2008
The Blue Sky Green Field Wind Energy Center, located in the towns of Calumet and Marshfield in northeast Fond du Lac County, is designed to generate 145 megawatts (MW) of electricity, and is capable of powering approximately 36,000 average residential homes. The site consists of 88 wind turbines.
Construction of the project began in June 2007. On May 19, 2008, Blue Sky Green Field was placed into commercial operation. The turbines are capable of generating more than 328 million emission-free kilowatt-hours annually.
Saturday, Sept.13
9:30 a.m. – 1 p.m.
Blue Sky Green Field Office
N9470 County Highway W
Malone, WI 53049
Tours will be given approximately every 30 minutes. WE Energies invites you to stop by at your convenience during the tour hours listed above. No reservations required.
The turbine is located a short walking distance from the parkingarea. Please wear sturdy shoes suitable for walking on a graveled surface.
0 comments:
Post a Comment